        Hoist installation position
         

        Installation position

        1.搭設操作棚,并保證操作人員能看清指揮人員和拖動或吊起的物件。施工過程中的建筑物、腳手架以及現場堆放材料、構件等,都不應影響司機對操作范圍內全過程的監視。處于危險作業區域內操作棚,頂部應符合防護棚的要求。

        1 erection operation shed, and ensure that the operator can see command staff and drag or lift objects. In the process of construction, scaffold building and field stacking materials, components, should not affect the driver of operating range in the whole process of monitoring. In the dangerous area shed, shall comply with the requirements of the top shed.

        2.地基堅固。卷揚機應盡量遠離危險作業區域,選擇地勢較高、土質堅固的地方,埋設地錨用鋼絲繩與卷揚機座鎖牢,前方應打樁,防治卷揚機移動和傾覆。

        2 solid foundation. Hoist should be kept away from the dangerous area, choose the higher soil, firm ground, burying ground anchor rope and hoist frame lock, the front should be piling, control hoist movement and overturn.

        3.卷筒方向。卷筒與導向滑輪中心對正,從卷筒到第一個導向滑輪的距離,按規定是:帶槽卷筒應大于卷筒寬度的15倍,無槽卷筒應大于20倍,以防止卷筒運轉時鋼絲繩相互錯疊和導向輪翼緣與鋼絲繩磨損。

        3 drum direction. The reel and guide pulley center on it, from the drum to the first guide block distance, according to the regulation is: should be more than 15 times the width of the roll grooved drum, no slot reel should be more than 20 times, in order to prevent the wire rope drum operation mutually staggered and guide wheel flange and the steel wire rope wear.

        作業人員要求

        Homework personnel requirements

        1.卷揚機司機應經專業培訓持證上崗,作業時要精神集中,發現視線內有障礙物時,要及時清除,信號不清時不得操作。

        The 1 Engineer shall be subject to professional training, work to concentrate, found in the line of sight when there are obstacles, should be promptly removed, not the operation signal is not clear.

        2.作業前應先空轉,確認電氣、制動以及環境情況良好才能操作,操作人員應詳細了解當班作業的主要內容和工作量。

        2 before the operation should first idling, confirm the electrical, braking and environment in good condition before operation, the operator should understand in detail the main content and work shift work.

        3.當被吊物沒有完全落在地面時,司機不得離崗。休息或暫停作業時,必須將物件或吊籠降至地面。下班后,應切斷電源,關好電閘箱。

        3 when the hoisted matter did not fall on the ground, the driver may not leave. Rest or suspend operations, must be the objects or hanging down the cage. After work, should cut off the power, turn off the switch box.

        4.司機應隨時注意操作條件及鋼絲繩的磨損情況。當荷載變化第一次提升時,應先離地0.5m稍停,檢查無問題時再繼續上升。

        4 the driver should always pay attention to wear operating conditions and wire rope. When the load changes first promotion, should first from 0.5m to pause, and then continue to rise check no problem.

        5.使用單筒卷揚機,必須用剎車控制下降速度,不能過快和猛急剎車,要緩緩落下。

        5 the use of single drum winch, must use the brake to control the descending speed, not too fast and fierce brakes, to slowly fall.

        6.禁止使用扳把型開關,防止發生碰撞誤操作。

        6 prohibit the use of pull type switch, avoid the collision error operation.

        7.鋼絲繩要定期涂抹黃油并要放在專用的槽道里,以防碾壓傾軋,破壞鋼絲繩的強度。

        7 wire rope to regular butter and should be put in the groove dedicated, in order to prevent rolling strife, failure of wire rope strength.

        8.卷揚機的額定拉力大于125KN時應設置排繩器,應在卷筒上的鋼絲繩最少應保留3~5圈,鋼絲繩的末端應固定可靠。

        The rated capacity of 8 hoist should be set up more than 125KN rope, wire rope on the drum shall be at least 3~5 ring should be retained, the end of the wire rope should be fixed and reliable.

        9.卷筒外邊至最外層鋼絲繩的距離應不小于鋼絲繩直徑的1.5倍

        9 drum outside to the outer layer of the steel wire distance shall be not less than 1.5 times the diameter of the steel wire rope

        10.作業中,任何人不得跨越正在作業的卷揚鋼絲繩。

        The 10 operations, and no one may cross winding wire rope working.

        Copyright © 2014 Nantong City, Jun Hai Machinery Technology Co., Ltd.Copyright © 2014 Nantong City, Jun Hai Machinery Technology Co., Ltd.
        主站蜘蛛池模板: 777777农村一级毛片| 久久精品国产亚洲AV香蕉| 精品亚洲成a人片在线观看| 国产成人av在线影院| 91草莓视频在线观看| 特大巨黑人吊性xxx视频| 国产精品偷伦视频观看免费| 久久久精品人妻一区二区三区| 欧美性猛交ⅹxxx乱大交禽| 国产乱弄免费视频| 99精品国产在热久久| 成人午夜精品无码区久久| 亚洲激情视频在线观看| 车车好快的车车流水网站入口| 国产精品区免费视频| 97色在线观看| 无遮挡无删动漫肉在线观看| 亚洲av无码一区二区三区电影 | 天堂8在线天堂资源bt| 中文国产成人精品久久96| 日本五月天婷久久网站| 免费扒开女人下面使劲桶| 香蕉久久综合精品首页| 成人艳情一二三区| 久久婷婷五月综合尤物色国产| 狠狠色噜噜狠狠狠888米奇视频 | av片在线播放| 日本肉漫在线观看| 亚洲av永久无码一区二区三区| 欧美视频亚洲色图| 四虎国产精品永久在线播放| 4480yy私人影院论| 在线观免费看高清影视剧| spoz是什么意思医学| 幻女free性zozozoxxxxx| 乱人伦人妻中文字幕在线入口| 欧美怡红院免费全部视频| 亚洲欧美日韩另类在线专区 | 好吊日免费视频| 一级毛片免费的| 成人毛片18女人毛片免费96 |